Driveways and paths

Tarmac paths and footpaths

Paths cost more per square metre than drives because the work is narrow, hand-laid and edged on both sides. They also tend to fail at the edges first, so the edging is the part worth paying attention to.

GUIDE£55–£90 per m² inc VAT
Tarmac garden path with timber edging curving to a shed

A tarmac path is a lighter version of a drive build: a compacted stone base of around 100 mm, a binder course and a fine surface course, laid by hand and held in by timber edging, kerbs or blocks.

What is included in a tarmac path?

  • Path set out to the line and width you want
  • Excavation to about 150–180 mm with spoil removed
  • MOT Type 1 base, about 100 mm, compacted
  • Timber, kerb or block edging on both sides
  • Binder and surface course laid hot by hand and rolled
  • Gentle cross-fall so water runs off to the border

How is it built?

Surface courseabout 20 mm AC 6Binder courseabout 40–50 mm AC 20Baseabout 100 mm MOT Type 1Edgestimber, kerbs or blocksINDICATIVE CROSS-SECTION · NOT TO SCALE

How much does a tarmac path cost?

As a 2026 guide at our UK midpoint rate, £55–£90 per m² inc VAT. Edging, drainage and access are itemised separately where they apply.

ItemGuide price (inc VAT)
Tarmac garden path or footpath, hand-laid£55–£90 per m²
Example: 10 m² path£660–£1,100
Example: 20 m² path£1,200–£2,000
Example: 40 m² path£2,200–£3,600

Rates vary by region:

RegionGuide (inc VAT)
London£66–£108 per m²
South East£61–£99 per m²
East of England£58–£94 per m²
South West£57–£93 per m²
West Midlands£55–£90 per m²
East Midlands£54–£88 per m²
North West£53–£87 per m²
Yorkshire and the Humber£53–£86 per m²
North East£51–£84 per m²
Wales£52–£86 per m²
Scotland£54–£88 per m²
Northern Ireland£48–£79 per m²

Guides only. Your survey turns these into a fixed written price. Full price list · Guide price tool

When it suits

  • Side passages and bin stores
  • Garden paths to sheds and offices
  • Footpaths on shared grounds and allotments

Watch out for

  • Very narrow runs may need a pedestrian roller and more labour
  • Tree roots lift thin paths
  • Timber edging needs replacing before the tarmac does

How long does it take and how long does it last?

On site
Often 1–2 days
Lifespan
Commonly 15 years or more with sound edges

Do I need planning permission?

It depends where you live and where the water goes.

  • England: A new hard surface over 5 m² in front of a house needs planning permission unless it is porous or drains to a lawn, border or soakaway within the property.
  • Wales: New front hardstanding should be porous or drain to a permeable area within the property, and work covering 100 m² or more with drainage effects usually needs SAB approval first.
  • Scotland: A hard surface between the house and a road is permitted development only if it is porous or drains to a porous area within the property, whatever its size.
  • Northern Ireland: More than 5 m² of hard surface in front of a house should be porous or drain to a porous area within the property; DfI Roads approves dropped kerbs.

Dropped kerbs always need the highway authority's approval: the council in England, Wales and Scotland, and DfI Roads in Northern Ireland. Read the full planning guide.

What happens next?

  1. Tell us about the job

    Use the guide price tool, the form, WhatsApp or the phone. A postcode, rough size and a couple of photos are enough to start.

  2. Survey and measure

    We check the ground, levels, edges, drainage and access, and the planning and kerb position where it applies.

  3. Written specification and price

    You get an itemised quote listing every layer, the edging, drainage, waste and VAT. The price is fixed once the spec is agreed.

  4. Build day

    Dig-out and base first, then hot binder and surface course rolled in, edges finished and the site cleared. You get aftercare notes before we leave.

Tarmac paths and footpaths: questions

How much does a tarmac path cost?

As a 2026 guide, about £55–£90 per m² including VAT for a hand-laid path with a new base and edging. Short, narrow paths sit at the top of the range because of set-up time.

How thick should a tarmac footpath be?

For walking traffic, about 100 mm of compacted Type 1 with a 40–50 mm binder and a 20 mm surface course is a common build. If a mower or quad will use it, go thicker.

Can you lay a path and a drive at the same time?

Yes, and it saves money because the crew and hot material are already on site.

What edging is best for a tarmac path?

Treated timber is cheapest and suits gardens; concrete kerbs or blocks last longer and give a cleaner line.

Can a tarmac path be laid on a slope?

Yes, within reason. Steep paths may need steps or a textured finish; we set out the falls on site.

Where do we offer tarmac path work?

Across the UK. Choose your area for local prices and towns.

Related services

Free survey for new surfacing

Get a written quote for tarmac paths and footpaths

Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.

  • Surface courseDEPTH + MIX
  • Binder courseDEPTH + MIX
  • Sub-baseDEPTH + MATERIAL
  • Edges, drainage, VATITEMISED
Call nowGet a price