Driveways and paths

Tarmac paths and footpaths in Surrey

We survey and price tarmac paths across Surrey, from Woking to Guildford and Esher, with every layer written into the quote.

SURREY GUIDE£61–£99 per m² inc VAT
Tarmac garden path with timber edging curving to a shed, typical of tarmac path work

How much does a tarmac path cost in Surrey?

Rates in Surrey follow the South East, about 10% above our UK midpoint.

ItemGuide price (inc VAT)
Tarmac garden path or footpath, hand-laid£61–£99 per m²
Example: 10 m² path£730–£1,200
Example: 20 m² path£1,350–£2,200
Example: 40 m² path£2,400–£3,950

Towns we cover in Surrey

Postcode areas: CR, GU, KT, RH, SM, TN, TW.

What is included?

A tarmac path is a lighter version of a drive build: a compacted stone base of around 100 mm, a binder course and a fine surface course, laid by hand and held in by timber edging, kerbs or blocks.

  • Path set out to the line and width you want
  • Excavation to about 150–180 mm with spoil removed
  • MOT Type 1 base, about 100 mm, compacted
  • Timber, kerb or block edging on both sides
  • Binder and surface course laid hot by hand and rolled
  • Gentle cross-fall so water runs off to the border

Rules in Surrey

Repairs, paths and edging work rarely need planning permission. In England, a new hard surface over 5 m² in front of a house needs planning permission unless it is porous or drains to a lawn, border or soakaway within the property.

Tarmac paths and footpaths in Surrey: questions

How much does a tarmac path cost in Surrey?

As a 2026 guide, about £61–£99 per m² inc VAT in Surrey. The survey confirms a fixed price.

Which towns in Surrey do you cover?

Woking, Guildford, Esher, Redhill, Staines, Banstead, Leatherhead, Ewell and more.

How long does a tarmac path take?

Often 1–2 days.

How much does a tarmac path cost?

As a 2026 guide, about £55–£90 per m² including VAT for a hand-laid path with a new base and edging. Short, narrow paths sit at the top of the range because of set-up time.

Other services in Surrey

Free survey for new surfacing

Get a written tarmac quote

Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.

  • Surface courseDEPTH + MIX
  • Binder courseDEPTH + MIX
  • Sub-baseDEPTH + MATERIAL
  • Edges, drainage, VATITEMISED
Call nowGet a price