New black tarmac driveway with a charcoal block border in front of a 1930s brick semi
Tarmac and asphalt surfacing · UK-wide

Tarmac driveways, laid to a written spec

New tarmac drives, resurfacing, repairs, paths, small car parks and private roads. Every quote lists the dig depth, sub-base, binder course, surface course, edging and drainage, so you can see exactly what you are paying for.

  • Free survey for new surfacing
  • Fixed written price once the spec is agreed
  • Homes and light commercial, across the UK
Get a free quoteJOB SHEET · TD-01
What goes underneath

A typical tarmac drive, layer by layer

Most tarmac fails from below. These are the depths a car drive usually needs, and the ones we write on your quote.

Surface course20–30 MM · AC 6 DENSE
Binder course50–60 MM · AC 20 DENSE
Sub-base~150 MM · MOT TYPE 1
EdgesKERBS OR BLOCKS ON A HAUNCH
  • Free survey for new surfacingDrives, roads and car parks
  • Every layer in writingDepths and mixes on the quote
  • Fixed price once agreedNo per-square-foot surprises
  • Homes and light commercialDrives to small car parks
  • UK-wide coverRemote areas by arrangement
How we work

Built from the ground up, priced line by line

Tarmac looks the same on the day it is laid whether the base is 50 mm or 150 mm. The difference shows a few winters later, so we put the build on paper.

Depths on paper

Your quote lists the dig depth, sub-base, binder course and surface course, so you can compare like with like.

Edges that hold

Kerbs, blocks or setts on a concrete haunch along every open edge, because tarmac fails from the sides first.

Water with somewhere to go

Falls, channels and soakaways planned before laying, and front-garden rules checked for your nation.

No doorstep deals

We never cold-call or sell leftover tarmac. Every job starts with a survey and a written quote you can take time over.

Services

What we surface

Driveways and paths for homes, the edges and drainage that make them last, and light commercial work from small car parks to farm tracks.

Tarmac driveways and paths

All driveways and paths →

Edges, drainage and kerbs

All edges, drainage and kerbs →

Car parks, private roads and yards

All car parks and roads →
Quote checker

Is your tarmac quote complete?

A cheap quote is usually missing a layer. Tick off what your quote actually says, and see what to ask about before you sign.

Check a quote
  • Dig depth or formation level
  • Sub-base material and compacted depth
  • Binder course thickness and mix
  • Surface course thickness and mix
  • Edge restraint
  • Drainage and falls

Six of the twelve things a proper quote should state.

Prices

How much does a tarmac driveway cost?

A new tarmac drive with a full dig-out typically costs about £60–£95 per m² including VAT, and resurfacing a sound drive about £25–£45 per m².

Surface (homes)Guide (inc VAT)
New black tarmac drive, full dig-out and new sub-base£60–£95 per m²
Red tarmac drive, full dig-out and new sub-base£75–£115 per m²
Porous asphalt drive on a permeable stone base£80–£125 per m²
Tar and chip drive with a new sub-base£45–£75 per m²
Tarmac resurfacing over a sound existing base£25–£45 per m²
Tarmac garden path or footpath, hand-laid£55–£90 per m²

2026 guide ranges, West Midlands midpoint, including VAT. London is about 20% higher; Northern Ireland about 12% lower. See all prices, including commercial.

Reviews

Genuine reviews only

We are a new surfacing service and we won't show reviews we haven't earned. Once customers leave reviews on Google, they will appear here, unedited.

Had work done by us? We'd value an honest review once your job is finished. We'll send you the link.

What happens next

Four steps from enquiry to new surface

  1. Tell us about the job

    Use the guide price tool, the form, WhatsApp or the phone. A postcode, rough size and a couple of photos are enough to start.

  2. Survey and measure

    We check the ground, levels, edges, drainage and access, and the planning and kerb position where it applies.

  3. Written specification and price

    You get an itemised quote listing every layer, the edging, drainage, waste and VAT. The price is fixed once the spec is agreed.

  4. Build day

    Dig-out and base first, then hot binder and surface course rolled in, edges finished and the site cleared. You get aftercare notes before we leave.

Tarmac driveway questions

How much does a tarmac driveway cost?

As a 2026 guide, about £60–£95 per m² including VAT for a full dig-out with a new sub-base and two tarmac courses, and about £25–£45 per m² to resurface a sound drive. London and the South East cost more; the North, Wales and Northern Ireland usually less.

How long does a tarmac driveway take to lay?

Most domestic drives take 2–4 working days, including dig-out, sub-base, edging and the two tarmac courses. Drainage, a dropped kerb or bad weather can add time.

How long does a tarmac drive last?

Commonly 15–20 years when the sub-base, edges and drainage are right, and often longer. An overlay on an older base usually lasts 8–15 years.

When can I drive on new tarmac?

Walk on it once it has cooled, often the same day. Allow at least 48 hours before parking, preferably 3–5 days, and longer in hot weather. Avoid turning the wheels while stationary for the first few weeks.

Do I need planning permission for a tarmac drive?

In England, a new front hard surface over 5 m² needs permission unless it is porous or drains to a permeable area within the property. Wales, Scotland and Northern Ireland have their own versions; our planning guide covers each one.

Is the survey free?

Yes, for new surfacing: drives, paths, private roads and car parks. Small repairs are often priced from photos; where a visit is needed for a repair-only job, we tell you any charge before booking. Remote areas are by arrangement.

Do your prices include VAT?

Home prices on this site include VAT at 20%. Commercial prices are shown excluding VAT, with the VAT-inclusive figure alongside.

Can you lay tarmac over my existing drive?

If the base is sound and levels allow, yes: we repair failed patches, spray a bond coat and lay a new surface course. If the drive has sunk or broken up, a rebuild is better value.

More questions and answers →

Free survey for new surfacing

Get a written tarmac quote

Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.

  • Surface courseDEPTH + MIX
  • Binder courseDEPTH + MIX
  • Sub-baseDEPTH + MATERIAL
  • Edges, drainage, VATITEMISED
Call nowGet a price