Scotland

Tarmac surfacing in Highland and Moray

Everything we do in Highland and Moray, from new tarmac drives in Inverness to car park resurfacing and farm tracks.

Wide new tarmac driveway with granite sett border leading to a garage

Services and guide prices in Highland and Moray

Rates in Highland and Moray follow Scotland, about 8% above our UK midpoint.

ServiceGuide price
New tarmac driveways£65–£102 per m² inc VAT
Red tarmac driveways£81–£124 per m² inc VAT
Yards and forecourts£54–£92 per m² ex VAT
Car park resurfacing£22–£38 per m² ex VAT
Permeable tarmac driveways£86–£135 per m² inc VAT
Edging and kerbs for tarmac£27–£59 per metre inc VAT
Car park and yard repairs£160–£430 each ex VAT
Tar and chip driveways£49–£81 per m² inc VAT
Tarmac driveway repairs£160–£430 each inc VAT
Drainage for tarmac drives£65–£129 per metre inc VAT

Also available: tarmac driveway resurfacing, dropped kerbs and vehicle crossings, tarmac paths and footpaths, car park surfacing, farm tracks and rural access, front garden to tarmac driveway, private and access road surfacing, line marking and speed humps.

What common jobs come to in Highland and Moray:

  • 20 m² tarmac garden path: about £1,300–£2,150.
  • 250 m² car park resurface (ex VAT): about £5,400–£9,450.
  • Allow about £1,100–£1,950 for a 40 m² tarmac overlay.

Towns in Highland and Moray

Planning and dropped kerbs in Highland and Moray

In Scotland, permitted development allows a hard surface between a house and a road only if it is porous or the water drains to a porous area within the property. Unlike England there is no 5 m² allowance, so it applies to any size. Conservation areas and the grounds of listed buildings have extra restrictions. The council, as roads authority, controls any new or widened access across a footway.

Highland and Moray: questions

Who approves dropped kerbs in Highland and Moray?

The council as roads authority.

Do you do car parks and private roads in Highland and Moray?

Yes. Car park, yard and private road work is priced excluding VAT from a site survey.

How long does a tarmac drive take in Highland and Moray?

Usually 2–4 working days on site once the survey and specification are agreed.

How much is a new tarmac drive in Highland and Moray?

As a 2026 guide, about £65–£102 per m² inc VAT, before edging and drainage.

Free survey for new surfacing

Get a written tarmac quote

Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.

  • Surface courseDEPTH + MIX
  • Binder courseDEPTH + MIX
  • Sub-baseDEPTH + MATERIAL
  • Edges, drainage, VATITEMISED
Call nowGet a price