Tarmac surfacing in Powys
We cover 4 towns in Powys for tarmac drives, resurfacing, repairs, car parks and private roads.

Services and guide prices in Powys
Rates in Powys follow Wales, about 5% below our UK midpoint.
| Service | Guide price |
|---|---|
| New tarmac driveways | £57–£90 per m² inc VAT |
| Car park resurfacing | £19–£33 per m² ex VAT |
| Drainage for tarmac drives | £57–£114 per metre inc VAT |
| Car park surfacing | £48–£81 per m² ex VAT |
| Edging and kerbs for tarmac | £24–£52 per metre inc VAT |
| Tarmac driveway resurfacing | £24–£43 per m² inc VAT |
| Red tarmac driveways | £71–£109 per m² inc VAT |
| Farm tracks and rural access | £28–£52 per m² ex VAT |
| Permeable tarmac driveways | £76–£119 per m² inc VAT |
| Tarmac driveway repairs | £140–£380 each inc VAT |
Also available: front garden to tarmac driveway, private and access road surfacing, tarmac paths and footpaths, line marking and speed humps, dropped kerbs and vehicle crossings, car park and yard repairs, tar and chip driveways, yards and forecourts.
Worked examples at Powys rates, before edging and drainage:
- 70 m² new tarmac drive: about £4,000–£6,300.
- A 600 m² car park resurface (ex VAT) works out at roughly £11,400–£19,950.
- A 75 m² tarmac overlay works out at roughly £1,800–£3,200.
Towns in Powys
Planning and dropped kerbs in Powys
In Wales, a new hard surface in front of a house is permitted development only if it is porous or drains to a permeable area within the property; repairing or replacing up to 5 m² of existing hardstanding is allowed without meeting that condition. Separately, since January 2019, construction covering 100 m² or more that affects drainage generally needs approval from the council's SuDS Approving Body (SAB) before work starts, even where planning permission is not needed. Larger drives, shared surfaces and car parks often reach that threshold.
Powys: questions
Do you do car parks and private roads in Powys?
Yes. Car park, yard and private road work is priced excluding VAT from a site survey.
How long does a tarmac drive take in Powys?
Usually 2–4 working days on site once the survey and specification are agreed.
How much is a new tarmac drive in Powys?
As a 2026 guide, about £57–£90 per m² inc VAT, before edging and drainage.
Who approves dropped kerbs in Powys?
The council as highway authority.
Get a written tarmac quote
Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.
- Surface courseDEPTH + MIX
- Binder courseDEPTH + MIX
- Sub-baseDEPTH + MATERIAL
- Edges, drainage, VATITEMISED