Dropped kerbs and vehicle crossings in Powys
Looking for dropped kerbs in Powys? Start with a guide price, then a survey that turns it into a fixed, written specification.

How much does a dropped kerb cost in Powys?
Rates in Powys follow Wales, about 5% below our UK midpoint.
| Item | Guide price (inc VAT) |
|---|---|
| Dropped kerb construction where the council allows an approved contractor | £950–£2,850 per job |
Towns we cover in Powys
Postcode areas: LD, SY.
What is included?
A dropped kerb, or vehicle crossing, is a section of pavement and kerb lowered and strengthened so a vehicle can legally cross the footway to reach a driveway. It needs the highway authority's approval before any work starts.
- Check the frontage: trees, lamp posts, covers, junctions and sight lines
- Help preparing the application and site plan
- Planning permission check for classified roads
- Construction to the council's specification where approved contractors are allowed
- Footway reinstatement in tarmac or to match
- Coordinated with the new drive so both are finished together
Rules in Powys
In Wales, a new hard surface in front of a house is permitted development only if it is porous or drains to a permeable area within the property; repairing or replacing up to 5 m² of existing hardstanding is allowed without meeting that condition. Separately, since January 2019, construction covering 100 m² or more that affects drainage generally needs approval from the council's SuDS Approving Body (SAB) before work starts, even where planning permission is not needed. Larger drives, shared surfaces and car parks often reach that threshold. Any new or widened crossing over the pavement needs approval from the council as highway authority.
Dropped kerbs and vehicle crossings in Powys: questions
How much does a dropped kerb cost in Powys?
As a 2026 guide, about £950–£2,850 per job inc VAT in Powys. The survey confirms a fixed price.
Which towns in Powys do you cover?
Newtown, Brecon, Welshpool, Llandrindod Wells.
How long does a dropped kerb take?
Approval often takes weeks; building is usually 1–2 days.
Do I need planning permission for a dropped kerb?
You do if the road is classified (an A, B or C road) and in some other cases. Unclassified residential roads usually need only the highway licence, but check your council's guidance.
Other services in Powys
Get a written tarmac quote
Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.
- Surface courseDEPTH + MIX
- Binder courseDEPTH + MIX
- Sub-baseDEPTH + MATERIAL
- Edges, drainage, VATITEMISED