Driveways and paths

New tarmac driveways in Powys

Across in Powys, we cover 4 towns for new tarmac driveways, including Newtown, Brecon and Welshpool.

POWYS GUIDE£57–£90 per m² inc VAT
Wide new tarmac driveway with granite sett border leading to a garage, typical of new tarmac driveway work

How much does a new tarmac driveway cost in Powys?

Rates in Powys follow Wales, about 5% below our UK midpoint.

ItemGuide price (inc VAT)
New black tarmac drive, full dig-out and new sub-base£57–£90 per m²
Example: 30 m² drive£1,900–£3,000
Example: 50 m² drive£2,850–£4,500
Example: 80 m² drive£4,550–£7,200

Towns we cover in Powys

Postcode areas: LD, SY.

What is included?

A new tarmac driveway is built from the ground up: the old surface and soil are dug out, a compacted stone sub-base is laid, then a hot binder course and a finer surface course are spread and rolled, and the edges are held by kerbs or blocks.

  • Break out and remove the old surface and spoil
  • Geotextile membrane where the ground is soft or clay
  • MOT Type 1 sub-base laid and compacted in layers, about 150 mm
  • Binder course (AC 20 dense), about 50–60 mm, laid hot and rolled
  • Surface course (AC 6 dense), about 20–30 mm, laid hot and rolled
  • Falls set so water runs to a channel, gully or soft landscaping

Rules in Powys

In Wales, a new hard surface in front of a house is permitted development only if it is porous or drains to a permeable area within the property; repairing or replacing up to 5 m² of existing hardstanding is allowed without meeting that condition. Separately, since January 2019, construction covering 100 m² or more that affects drainage generally needs approval from the council's SuDS Approving Body (SAB) before work starts, even where planning permission is not needed. Larger drives, shared surfaces and car parks often reach that threshold. If the job needs a dropped kerb, the council as highway authority approves it before any work on the footway.

How it is built

Surface course20–30 mm AC 6 denseBinder course50–60 mm AC 20 denseSub-baseabout 150 mm MOT Type 1Edgeskerbs or blocks on a concrete haunchINDICATIVE CROSS-SECTION · NOT TO SCALE

New tarmac driveways in Powys: questions

How much does a new tarmac driveway cost in Powys?

As a 2026 guide, about £57–£90 per m² inc VAT in Powys. The survey confirms a fixed price.

Which towns in Powys do you cover?

Newtown, Brecon, Welshpool, Llandrindod Wells.

How long does a new tarmac driveway take?

Usually 2–4 working days for a typical drive, longer with drainage or a dropped kerb.

How deep should a tarmac driveway be?

For cars, a common build is about 150 mm of compacted MOT Type 1, a 50–60 mm binder course and a 20–30 mm surface course. Soft ground or heavier vehicles need more. Your quote should state each depth.

Other services in Powys

Free survey for new surfacing

Get a written tarmac quote

Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.

  • Surface courseDEPTH + MIX
  • Binder courseDEPTH + MIX
  • Sub-baseDEPTH + MATERIAL
  • Edges, drainage, VATITEMISED
Call nowGet a price