Tarmac surfacing in Aberdeen and Aberdeenshire
Tarmac driveways and light commercial surfacing in Aberdeen and Aberdeenshire: guide prices for Scotland, the towns we cover and the local rules.

Services and guide prices in Aberdeen and Aberdeenshire
Rates in Aberdeen and Aberdeenshire follow Scotland, about 2% below our UK midpoint.
| Service | Guide price |
|---|---|
| New tarmac driveways | £59–£93 per m² inc VAT |
| Car park and yard repairs | £150–£390 each ex VAT |
| Red tarmac driveways | £74–£113 per m² inc VAT |
| Edging and kerbs for tarmac | £24–£54 per metre inc VAT |
| Line marking and speed humps | £40–£120 per bay ex VAT |
| Tarmac driveway repairs | £150–£390 each inc VAT |
| Tarmac driveway resurfacing | £24–£44 per m² inc VAT |
| Tarmac paths and footpaths | £54–£88 per m² inc VAT |
| Permeable tarmac driveways | £78–£122 per m² inc VAT |
| Car park resurfacing | £20–£34 per m² ex VAT |
Also available: yards and forecourts, private and access road surfacing, farm tracks and rural access, dropped kerbs and vehicle crossings, car park surfacing, tar and chip driveways, drainage for tarmac drives, front garden to tarmac driveway.
What common jobs come to in Aberdeen and Aberdeenshire:
- Allow about £6,250–£11,000 for a 320 m² car park resurface (ex VAT).
- 70 m² new tarmac drive: about £4,100–£6,500.
- Allow about £1,200–£1,950 for a 20 m² tarmac garden path.
Towns in Aberdeen and Aberdeenshire
Planning and dropped kerbs in Aberdeen and Aberdeenshire
In Scotland, permitted development allows a hard surface between a house and a road only if it is porous or the water drains to a porous area within the property. Unlike England there is no 5 m² allowance, so it applies to any size. Conservation areas and the grounds of listed buildings have extra restrictions. The council, as roads authority, controls any new or widened access across a footway.
Aberdeen and Aberdeenshire: questions
Which postcode areas do you cover in Aberdeen and Aberdeenshire?
AB.
How much is a new tarmac drive in Aberdeen and Aberdeenshire?
As a 2026 guide, about £59–£93 per m² inc VAT, before edging and drainage.
Do you cover all of Aberdeen and Aberdeenshire?
Yes, including Aberdeen, Peterhead, Inverurie, Fraserburgh, Westhill, Stonehaven.
How long does a tarmac drive take in Aberdeen and Aberdeenshire?
Usually 2–4 working days on site once the survey and specification are agreed.
Get a written tarmac quote
Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.
- Surface courseDEPTH + MIX
- Binder courseDEPTH + MIX
- Sub-baseDEPTH + MATERIAL
- Edges, drainage, VATITEMISED