Tarmac paths and footpaths in Northumberland
Tarmac paths and footpaths in Northumberland are priced from a site survey and an itemised specification, adjusted for the North East rates.

How much does a tarmac path cost in Northumberland?
Rates in Northumberland follow the North East, about 7% below our UK midpoint.
| Item | Guide price (inc VAT) |
|---|---|
| Tarmac garden path or footpath, hand-laid | £51–£84 per m² |
| Example: 10 m² path | £610–£1,000 |
| Example: 20 m² path | £1,150–£1,850 |
| Example: 40 m² path | £2,050–£3,350 |
Towns we cover in Northumberland
Postcode areas: NE.
What is included?
A tarmac path is a lighter version of a drive build: a compacted stone base of around 100 mm, a binder course and a fine surface course, laid by hand and held in by timber edging, kerbs or blocks.
- Path set out to the line and width you want
- Excavation to about 150–180 mm with spoil removed
- MOT Type 1 base, about 100 mm, compacted
- Timber, kerb or block edging on both sides
- Binder and surface course laid hot by hand and rolled
- Gentle cross-fall so water runs off to the border
Rules in Northumberland
Repairs, paths and edging work rarely need planning permission. In England, a new hard surface over 5 m² in front of a house needs planning permission unless it is porous or drains to a lawn, border or soakaway within the property.
Tarmac paths and footpaths in Northumberland: questions
How much does a tarmac path cost in Northumberland?
As a 2026 guide, about £51–£84 per m² inc VAT in Northumberland. The survey confirms a fixed price.
Which towns in Northumberland do you cover?
Blyth, Cramlington, Ashington, Bedlington, Morpeth, Prudhoe.
How long does a tarmac path take?
Often 1–2 days.
Can you lay a path and a drive at the same time?
Yes, and it saves money because the crew and hot material are already on site.
Other services in Northumberland
Get a written tarmac quote
Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.
- Surface courseDEPTH + MIX
- Binder courseDEPTH + MIX
- Sub-baseDEPTH + MATERIAL
- Edges, drainage, VATITEMISED