Tarmac paths and footpaths in Argyll and Bute
We survey and price tarmac paths across Argyll and Bute, from Helensburgh to Dunoon and Oban, with every layer written into the quote.

How much does a tarmac path cost in Argyll and Bute?
Rates in Argyll and Bute follow Scotland, about 8% above our UK midpoint. Work here is by arrangement because of travel and haulage.
| Item | Guide price (inc VAT) |
|---|---|
| Tarmac garden path or footpath, hand-laid | £59–£97 per m² |
| Example: 10 m² path | £710–£1,150 |
| Example: 20 m² path | £1,300–£2,150 |
| Example: 40 m² path | £2,350–£3,900 |
Towns we cover in Argyll and Bute
Postcode areas: G, PA.
What is included?
A tarmac path is a lighter version of a drive build: a compacted stone base of around 100 mm, a binder course and a fine surface course, laid by hand and held in by timber edging, kerbs or blocks.
- Path set out to the line and width you want
- Excavation to about 150–180 mm with spoil removed
- MOT Type 1 base, about 100 mm, compacted
- Timber, kerb or block edging on both sides
- Binder and surface course laid hot by hand and rolled
- Gentle cross-fall so water runs off to the border
Rules in Argyll and Bute
Repairs, paths and edging work rarely need planning permission. In Scotland, a hard surface between the house and a road is permitted development only if it is porous or drains to a porous area within the property, whatever its size.
Tarmac paths and footpaths in Argyll and Bute: questions
How much does a tarmac path cost in Argyll and Bute?
As a 2026 guide, about £59–£97 per m² inc VAT in Argyll and Bute. The survey confirms a fixed price.
Which towns in Argyll and Bute do you cover?
Helensburgh, Dunoon, Oban, by arrangement.
How long does a tarmac path take?
Often 1–2 days.
How much does a tarmac path cost?
As a 2026 guide, about £55–£90 per m² including VAT for a hand-laid path with a new base and edging. Short, narrow paths sit at the top of the range because of set-up time.
Other services in Argyll and Bute
Get a written tarmac quote
Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.
- Surface courseDEPTH + MIX
- Binder courseDEPTH + MIX
- Sub-baseDEPTH + MATERIAL
- Edges, drainage, VATITEMISED