Driveways and paths

Tarmac paths and footpaths in Bedfordshire

Looking for tarmac paths in Bedfordshire? Start with a guide price, then a survey that turns it into a fixed, written specification.

BEDFORDSHIRE GUIDE£58–£94 per m² inc VAT
Tarmac garden path with timber edging curving to a shed, typical of tarmac path work

How much does a tarmac path cost in Bedfordshire?

Rates in Bedfordshire follow the East of England, about 5% above our UK midpoint.

ItemGuide price (inc VAT)
Tarmac garden path or footpath, hand-laid£58–£94 per m²
Example: 10 m² path£690–£1,150
Example: 20 m² path£1,250–£2,100
Example: 40 m² path£2,300–£3,800

Towns we cover in Bedfordshire

Postcode areas: LU, MK, SG.

What is included?

A tarmac path is a lighter version of a drive build: a compacted stone base of around 100 mm, a binder course and a fine surface course, laid by hand and held in by timber edging, kerbs or blocks.

  • Path set out to the line and width you want
  • Excavation to about 150–180 mm with spoil removed
  • MOT Type 1 base, about 100 mm, compacted
  • Timber, kerb or block edging on both sides
  • Binder and surface course laid hot by hand and rolled
  • Gentle cross-fall so water runs off to the border

Rules in Bedfordshire

Repairs, paths and edging work rarely need planning permission. In England, householder permitted development (Class F of the 2015 General Permitted Development Order) lets you lay a hard surface in front of a house without planning permission if it is porous, or if the rainwater is directed to a permeable area within the property. If the area is more than 5 m² and neither applies, you need permission. Standard dense tarmac is not porous, so a dense tarmac drive needs a lawn, border, channel to a soakaway or other permeable route for its water.

How it is built

Surface courseabout 20 mm AC 6Binder courseabout 40–50 mm AC 20Baseabout 100 mm MOT Type 1Edgestimber, kerbs or blocksINDICATIVE CROSS-SECTION · NOT TO SCALE

Tarmac paths and footpaths in Bedfordshire: questions

How much does a tarmac path cost in Bedfordshire?

As a 2026 guide, about £58–£94 per m² inc VAT in Bedfordshire. The survey confirms a fixed price.

Which towns in Bedfordshire do you cover?

Luton, Bedford, Dunstable, Leighton Buzzard, Ampthill, Kempston, Biggleswade.

How long does a tarmac path take?

Often 1–2 days.

Can a tarmac path be laid on a slope?

Yes, within reason. Steep paths may need steps or a textured finish; we set out the falls on site.

Other services in Bedfordshire

Free survey for new surfacing

Get a written tarmac quote

Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.

  • Surface courseDEPTH + MIX
  • Binder courseDEPTH + MIX
  • Sub-baseDEPTH + MATERIAL
  • Edges, drainage, VATITEMISED
Call nowGet a price