Driveways and paths

Tarmac paths and footpaths in Gloucestershire

Across in Gloucestershire, we cover 6 towns for tarmac paths, including Gloucester, Cheltenham and Stroud.

GLOUCESTERSHIRE GUIDE£57–£93 per m² inc VAT
Tarmac garden path with timber edging curving to a shed, typical of tarmac path work

How much does a tarmac path cost in Gloucestershire?

Rates in Gloucestershire follow the South West, about 3% above our UK midpoint.

ItemGuide price (inc VAT)
Tarmac garden path or footpath, hand-laid£57–£93 per m²
Example: 10 m² path£680–£1,100
Example: 20 m² path£1,250–£2,050
Example: 40 m² path£2,250–£3,700

Towns we cover in Gloucestershire

Postcode areas: BS, GL.

What is included?

A tarmac path is a lighter version of a drive build: a compacted stone base of around 100 mm, a binder course and a fine surface course, laid by hand and held in by timber edging, kerbs or blocks.

  • Path set out to the line and width you want
  • Excavation to about 150–180 mm with spoil removed
  • MOT Type 1 base, about 100 mm, compacted
  • Timber, kerb or block edging on both sides
  • Binder and surface course laid hot by hand and rolled
  • Gentle cross-fall so water runs off to the border

Rules in Gloucestershire

Repairs, paths and edging work rarely need planning permission. In England, a new hard surface over 5 m² in front of a house needs planning permission unless it is porous or drains to a lawn, border or soakaway within the property.

Tarmac paths and footpaths in Gloucestershire: questions

How much does a tarmac path cost in Gloucestershire?

As a 2026 guide, about £57–£93 per m² inc VAT in Gloucestershire. The survey confirms a fixed price.

Which towns in Gloucestershire do you cover?

Gloucester, Cheltenham, Stroud, Yate, Tewkesbury, Cirencester.

How long does a tarmac path take?

Often 1–2 days.

Can you lay a path and a drive at the same time?

Yes, and it saves money because the crew and hot material are already on site.

Other services in Gloucestershire

Free survey for new surfacing

Get a written tarmac quote

Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.

  • Surface courseDEPTH + MIX
  • Binder courseDEPTH + MIX
  • Sub-baseDEPTH + MATERIAL
  • Edges, drainage, VATITEMISED
Call nowGet a price