Driveways and paths

Tarmac paths and footpaths in Gwent

Tarmac paths and footpaths in Gwent are priced from a site survey and an itemised specification, adjusted for Wales rates.

GWENT GUIDE£52–£86 per m² inc VAT
Tarmac garden path with timber edging curving to a shed, typical of tarmac path work

How much does a tarmac path cost in Gwent?

Rates in Gwent follow Wales, about 5% below our UK midpoint.

ItemGuide price (inc VAT)
Tarmac garden path or footpath, hand-laid£52–£86 per m²
Example: 10 m² path£630–£1,050
Example: 20 m² path£1,150–£1,900
Example: 40 m² path£2,100–£3,400

Towns we cover in Gwent

Postcode areas: CF, GL, NP.

What is included?

A tarmac path is a lighter version of a drive build: a compacted stone base of around 100 mm, a binder course and a fine surface course, laid by hand and held in by timber edging, kerbs or blocks.

  • Path set out to the line and width you want
  • Excavation to about 150–180 mm with spoil removed
  • MOT Type 1 base, about 100 mm, compacted
  • Timber, kerb or block edging on both sides
  • Binder and surface course laid hot by hand and rolled
  • Gentle cross-fall so water runs off to the border

Rules in Gwent

Repairs, paths and edging work rarely need planning permission. In Wales, a new hard surface in front of a house is permitted development only if it is porous or drains to a permeable area within the property; repairing or replacing up to 5 m² of existing hardstanding is allowed without meeting that condition. Separately, since January 2019, construction covering 100 m² or more that affects drainage generally needs approval from the council's SuDS Approving Body (SAB) before work starts, even where planning permission is not needed. Larger drives, shared surfaces and car parks often reach that threshold.

Tarmac paths and footpaths in Gwent: questions

How much does a tarmac path cost in Gwent?

As a 2026 guide, about £52–£86 per m² inc VAT in Gwent. The survey confirms a fixed price.

Which towns in Gwent do you cover?

Newport, Gwent, Cwmbran, Pontypool, Ebbw Vale, Risca, Blackwood, Brynmawr, Tredegar and more.

How long does a tarmac path take?

Often 1–2 days.

How thick should a tarmac footpath be?

For walking traffic, about 100 mm of compacted Type 1 with a 40–50 mm binder and a 20 mm surface course is a common build. If a mower or quad will use it, go thicker.

Other services in Gwent

Free survey for new surfacing

Get a written tarmac quote

Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.

  • Surface courseDEPTH + MIX
  • Binder courseDEPTH + MIX
  • Sub-baseDEPTH + MATERIAL
  • Edges, drainage, VATITEMISED
Call nowGet a price