Tarmac paths and footpaths in Cumbria
Across in Cumbria, we cover 6 towns for tarmac paths, including Carlisle, Barrow-in-Furness and Kendal.

How much does a tarmac path cost in Cumbria?
Rates in Cumbria follow the North West, about 3% below our UK midpoint.
| Item | Guide price (inc VAT) |
|---|---|
| Tarmac garden path or footpath, hand-laid | £53–£87 per m² |
| Example: 10 m² path | £640–£1,050 |
| Example: 20 m² path | £1,150–£1,900 |
| Example: 40 m² path | £2,150–£3,500 |
Towns we cover in Cumbria
Postcode areas: CA, LA.
What is included?
A tarmac path is a lighter version of a drive build: a compacted stone base of around 100 mm, a binder course and a fine surface course, laid by hand and held in by timber edging, kerbs or blocks.
- Path set out to the line and width you want
- Excavation to about 150–180 mm with spoil removed
- MOT Type 1 base, about 100 mm, compacted
- Timber, kerb or block edging on both sides
- Binder and surface course laid hot by hand and rolled
- Gentle cross-fall so water runs off to the border
Rules in Cumbria
Repairs, paths and edging work rarely need planning permission. In England, a new hard surface over 5 m² in front of a house needs planning permission unless it is porous or drains to a lawn, border or soakaway within the property.
How it is built
Tarmac paths and footpaths in Cumbria: questions
How much does a tarmac path cost in Cumbria?
As a 2026 guide, about £53–£87 per m² inc VAT in Cumbria. The survey confirms a fixed price.
Which towns in Cumbria do you cover?
Carlisle, Barrow-in-Furness, Kendal, Whitehaven, Workington, Penrith.
How long does a tarmac path take?
Often 1–2 days.
Can a tarmac path be laid on a slope?
Yes, within reason. Steep paths may need steps or a textured finish; we set out the falls on site.
Other services in Cumbria
Get a written tarmac quote
Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.
- Surface courseDEPTH + MIX
- Binder courseDEPTH + MIX
- Sub-baseDEPTH + MATERIAL
- Edges, drainage, VATITEMISED