Tarmac paths and footpaths in West Glamorgan
Tarmac paths and footpaths in West Glamorgan are priced from a site survey and an itemised specification, adjusted for Wales rates.

How much does a tarmac path cost in West Glamorgan?
Rates in West Glamorgan follow Wales, about 5% below our UK midpoint.
| Item | Guide price (inc VAT) |
|---|---|
| Tarmac garden path or footpath, hand-laid | £52–£86 per m² |
| Example: 10 m² path | £630–£1,050 |
| Example: 20 m² path | £1,150–£1,900 |
| Example: 40 m² path | £2,100–£3,400 |
Towns we cover in West Glamorgan
Postcode areas: SA.
What is included?
A tarmac path is a lighter version of a drive build: a compacted stone base of around 100 mm, a binder course and a fine surface course, laid by hand and held in by timber edging, kerbs or blocks.
- Path set out to the line and width you want
- Excavation to about 150–180 mm with spoil removed
- MOT Type 1 base, about 100 mm, compacted
- Timber, kerb or block edging on both sides
- Binder and surface course laid hot by hand and rolled
- Gentle cross-fall so water runs off to the border
Rules in West Glamorgan
Repairs, paths and edging work rarely need planning permission. In Wales, a new hard surface in front of a house is permitted development only if it is porous or drains to a permeable area within the property; repairing or replacing up to 5 m² of existing hardstanding is allowed without meeting that condition. Separately, since January 2019, construction covering 100 m² or more that affects drainage generally needs approval from the council's SuDS Approving Body (SAB) before work starts, even where planning permission is not needed. Larger drives, shared surfaces and car parks often reach that threshold.
Tarmac paths and footpaths in West Glamorgan: questions
How much does a tarmac path cost in West Glamorgan?
As a 2026 guide, about £52–£86 per m² inc VAT in West Glamorgan. The survey confirms a fixed price.
Which towns in West Glamorgan do you cover?
Swansea, Neath, Briton Ferry, Gorseinon, Clydach, Ystalyfera, Pontarddulais.
How long does a tarmac path take?
Often 1–2 days.
What edging is best for a tarmac path?
Treated timber is cheapest and suits gardens; concrete kerbs or blocks last longer and give a cleaner line.
Other services in West Glamorgan
Get a written tarmac quote
Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.
- Surface courseDEPTH + MIX
- Binder courseDEPTH + MIX
- Sub-baseDEPTH + MATERIAL
- Edges, drainage, VATITEMISED