Driveways and paths

Tarmac paths and footpaths in Tyne and Wear

From Newcastle upon Tyne to the smaller towns in Tyne and Wear, our tarmac paths quotes list the depths, edging, drainage and VAT so you can compare like with like.

TYNE AND WEAR GUIDE£51–£84 per m² inc VAT
Tarmac garden path with timber edging curving to a shed, typical of tarmac path work

How much does a tarmac path cost in Tyne and Wear?

Rates in Tyne and Wear follow the North East, about 7% below our UK midpoint.

ItemGuide price (inc VAT)
Tarmac garden path or footpath, hand-laid£51–£84 per m²
Example: 10 m² path£610–£1,000
Example: 20 m² path£1,150–£1,850
Example: 40 m² path£2,050–£3,350

Towns we cover in Tyne and Wear

Postcode areas: NE, SR, TF, WV.

What is included?

A tarmac path is a lighter version of a drive build: a compacted stone base of around 100 mm, a binder course and a fine surface course, laid by hand and held in by timber edging, kerbs or blocks.

  • Path set out to the line and width you want
  • Excavation to about 150–180 mm with spoil removed
  • MOT Type 1 base, about 100 mm, compacted
  • Timber, kerb or block edging on both sides
  • Binder and surface course laid hot by hand and rolled
  • Gentle cross-fall so water runs off to the border

Rules in Tyne and Wear

Repairs, paths and edging work rarely need planning permission. In England, a new hard surface over 5 m² in front of a house needs planning permission unless it is porous or drains to a lawn, border or soakaway within the property.

How it is built

Surface courseabout 20 mm AC 6Binder courseabout 40–50 mm AC 20Baseabout 100 mm MOT Type 1Edgestimber, kerbs or blocksINDICATIVE CROSS-SECTION · NOT TO SCALE

Tarmac paths and footpaths in Tyne and Wear: questions

How much does a tarmac path cost in Tyne and Wear?

As a 2026 guide, about £51–£84 per m² inc VAT in Tyne and Wear. The survey confirms a fixed price.

Which towns in Tyne and Wear do you cover?

Newcastle upon Tyne, Sunderland, South Shields, Gateshead, Washington, Tynemouth, Wallsend, Newburn and more.

How long does a tarmac path take?

Often 1–2 days.

Can a tarmac path be laid on a slope?

Yes, within reason. Steep paths may need steps or a textured finish; we set out the falls on site.

Other services in Tyne and Wear

Free survey for new surfacing

Get a written tarmac quote

Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.

  • Surface courseDEPTH + MIX
  • Binder courseDEPTH + MIX
  • Sub-baseDEPTH + MATERIAL
  • Edges, drainage, VATITEMISED
Call nowGet a price