Dropped kerbs and vehicle crossings in Tyne and Wear
Dropped kerbs and vehicle crossings in Tyne and Wear are priced from a site survey and an itemised specification, adjusted for the North East rates.

How much does a dropped kerb cost in Tyne and Wear?
Rates in Tyne and Wear follow the North East, about 7% below our UK midpoint.
| Item | Guide price (inc VAT) |
|---|---|
| Dropped kerb construction where the council allows an approved contractor | £930–£2,800 per job |
Towns we cover in Tyne and Wear
- Newcastle upon Tyne
- Sunderland
- South Shields
- Gateshead
- Washington
- Tynemouth
- Wallsend
- Newburn
- North Shields
- Whitley Bay
- Felling
- Jarrow
- Gosforth
- Hebburn
- Whickham
- Ryton
- Blaydon-on-Tyne
Postcode areas: NE, SR, TF, WV.
What is included?
A dropped kerb, or vehicle crossing, is a section of pavement and kerb lowered and strengthened so a vehicle can legally cross the footway to reach a driveway. It needs the highway authority's approval before any work starts.
- Check the frontage: trees, lamp posts, covers, junctions and sight lines
- Help preparing the application and site plan
- Planning permission check for classified roads
- Construction to the council's specification where approved contractors are allowed
- Footway reinstatement in tarmac or to match
- Coordinated with the new drive so both are finished together
Rules in Tyne and Wear
In England, a new hard surface over 5 m² in front of a house needs planning permission unless it is porous or drains to a lawn, border or soakaway within the property. A vehicle crossing over the footway is a separate approval, from the highway authority (the county or unitary council).
Dropped kerbs and vehicle crossings in Tyne and Wear: questions
How much does a dropped kerb cost in Tyne and Wear?
As a 2026 guide, about £930–£2,800 per job inc VAT in Tyne and Wear. The survey confirms a fixed price.
Which towns in Tyne and Wear do you cover?
Newcastle upon Tyne, Sunderland, South Shields, Gateshead, Washington, Tynemouth, Wallsend, Newburn and more.
How long does a dropped kerb take?
Approval often takes weeks; building is usually 1–2 days.
Can you build my dropped kerb?
Where your council allows approved or accredited contractors to build crossings, yes, to their specification. Where the council builds them itself, we coordinate the drive around its dates.
Other services in Tyne and Wear
Get a written tarmac quote
Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.
- Surface courseDEPTH + MIX
- Binder courseDEPTH + MIX
- Sub-baseDEPTH + MATERIAL
- Edges, drainage, VATITEMISED