Driveways and paths

Tarmac paths and footpaths in Lanarkshire

Tarmac paths and footpaths in Lanarkshire are priced from a site survey and an itemised specification, adjusted for Scotland rates.

LANARKSHIRE GUIDE£54–£88 per m² inc VAT
Tarmac garden path with timber edging curving to a shed, typical of tarmac path work

How much does a tarmac path cost in Lanarkshire?

Rates in Lanarkshire follow Scotland, about 2% below our UK midpoint.

ItemGuide price (inc VAT)
Tarmac garden path or footpath, hand-laid£54–£88 per m²
Example: 10 m² path£650–£1,050
Example: 20 m² path£1,200–£1,950
Example: 40 m² path£2,150–£3,550

Towns we cover in Lanarkshire

Postcode areas: G, ML.

What is included?

A tarmac path is a lighter version of a drive build: a compacted stone base of around 100 mm, a binder course and a fine surface course, laid by hand and held in by timber edging, kerbs or blocks.

  • Path set out to the line and width you want
  • Excavation to about 150–180 mm with spoil removed
  • MOT Type 1 base, about 100 mm, compacted
  • Timber, kerb or block edging on both sides
  • Binder and surface course laid hot by hand and rolled
  • Gentle cross-fall so water runs off to the border

Rules in Lanarkshire

Repairs, paths and edging work rarely need planning permission. In Scotland, permitted development allows a hard surface between a house and a road only if it is porous or the water drains to a porous area within the property. Unlike England there is no 5 m² allowance, so it applies to any size. Conservation areas and the grounds of listed buildings have extra restrictions. The council, as roads authority, controls any new or widened access across a footway.

Tarmac paths and footpaths in Lanarkshire: questions

How much does a tarmac path cost in Lanarkshire?

As a 2026 guide, about £54–£88 per m² inc VAT in Lanarkshire. The survey confirms a fixed price.

Which towns in Lanarkshire do you cover?

East Kilbride, Hamilton, Cumbernauld, Coatbridge, Airdrie, Motherwell, Rutherglen, Cambuslang and more.

How long does a tarmac path take?

Often 1–2 days.

Can a tarmac path be laid on a slope?

Yes, within reason. Steep paths may need steps or a textured finish; we set out the falls on site.

Other services in Lanarkshire

Free survey for new surfacing

Get a written tarmac quote

Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.

  • Surface courseDEPTH + MIX
  • Binder courseDEPTH + MIX
  • Sub-baseDEPTH + MATERIAL
  • Edges, drainage, VATITEMISED
Call nowGet a price