Tarmac paths and footpaths in Hampshire
Tarmac paths and footpaths in Hampshire are priced from a site survey and an itemised specification, adjusted for the South East rates.

How much does a tarmac path cost in Hampshire?
Rates in Hampshire follow the South East, about 10% above our UK midpoint.
| Item | Guide price (inc VAT) |
|---|---|
| Tarmac garden path or footpath, hand-laid | £61–£99 per m² |
| Example: 10 m² path | £730–£1,200 |
| Example: 20 m² path | £1,350–£2,200 |
| Example: 40 m² path | £2,400–£3,950 |
Towns we cover in Hampshire
- Southampton
- Portsmouth
- Basingstoke
- Gosport
- Waterlooville
- Farnborough
- Eastleigh
- Winchester
- Havant
- Andover
- Fareham
- Aldershot
- Fleet
- Totton
- New Milton
- Bordon
- Hythe
- Yateley
- Alton
- Emsworth
- Hedge End
- Bishopstoke
- Romsey
- Hayling Island
- Tadley
Postcode areas: BH, GU, PO, RG, SO, SP.
What is included?
A tarmac path is a lighter version of a drive build: a compacted stone base of around 100 mm, a binder course and a fine surface course, laid by hand and held in by timber edging, kerbs or blocks.
- Path set out to the line and width you want
- Excavation to about 150–180 mm with spoil removed
- MOT Type 1 base, about 100 mm, compacted
- Timber, kerb or block edging on both sides
- Binder and surface course laid hot by hand and rolled
- Gentle cross-fall so water runs off to the border
Rules in Hampshire
Repairs, paths and edging work rarely need planning permission. In England, a new hard surface over 5 m² in front of a house needs planning permission unless it is porous or drains to a lawn, border or soakaway within the property.
How it is built
Tarmac paths and footpaths in Hampshire: questions
How much does a tarmac path cost in Hampshire?
As a 2026 guide, about £61–£99 per m² inc VAT in Hampshire. The survey confirms a fixed price.
Which towns in Hampshire do you cover?
Southampton, Portsmouth, Basingstoke, Gosport, Waterlooville, Farnborough, Eastleigh, Winchester and more.
How long does a tarmac path take?
Often 1–2 days.
What edging is best for a tarmac path?
Treated timber is cheapest and suits gardens; concrete kerbs or blocks last longer and give a cleaner line.
Other services in Hampshire
Get a written tarmac quote
Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.
- Surface courseDEPTH + MIX
- Binder courseDEPTH + MIX
- Sub-baseDEPTH + MATERIAL
- Edges, drainage, VATITEMISED