Tarmac paths and footpaths in Somerset
We survey and price tarmac paths across Somerset, from Bath to Weston-super-Mare and Taunton, with every layer written into the quote.

How much does a tarmac path cost in Somerset?
Rates in Somerset follow the South West, about 3% above our UK midpoint.
| Item | Guide price (inc VAT) |
|---|---|
| Tarmac garden path or footpath, hand-laid | £57–£93 per m² |
| Example: 10 m² path | £680–£1,100 |
| Example: 20 m² path | £1,250–£2,050 |
| Example: 40 m² path | £2,250–£3,700 |
Towns we cover in Somerset
Postcode areas: BA, BS, DT, TA.
What is included?
A tarmac path is a lighter version of a drive build: a compacted stone base of around 100 mm, a binder course and a fine surface course, laid by hand and held in by timber edging, kerbs or blocks.
- Path set out to the line and width you want
- Excavation to about 150–180 mm with spoil removed
- MOT Type 1 base, about 100 mm, compacted
- Timber, kerb or block edging on both sides
- Binder and surface course laid hot by hand and rolled
- Gentle cross-fall so water runs off to the border
Rules in Somerset
Repairs, paths and edging work rarely need planning permission. In England, a new hard surface over 5 m² in front of a house needs planning permission unless it is porous or drains to a lawn, border or soakaway within the property.
How it is built
Tarmac paths and footpaths in Somerset: questions
How much does a tarmac path cost in Somerset?
As a 2026 guide, about £57–£93 per m² inc VAT in Somerset. The survey confirms a fixed price.
Which towns in Somerset do you cover?
Bath, Weston-super-Mare, Taunton, Yeovil, Bridgwater, Portishead, Frome, Burnham-on-Sea and more.
How long does a tarmac path take?
Often 1–2 days.
Can you lay a path and a drive at the same time?
Yes, and it saves money because the crew and hot material are already on site.
Other services in Somerset
Get a written tarmac quote
Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.
- Surface courseDEPTH + MIX
- Binder courseDEPTH + MIX
- Sub-baseDEPTH + MATERIAL
- Edges, drainage, VATITEMISED