New tarmac driveways in Rutland
Across in Rutland, we cover 1 towns for new tarmac driveways, including Oakham, Oakham and Oakham.

How much does a new tarmac driveway cost in Rutland?
Rates in Rutland follow the East Midlands, about 2% below our UK midpoint.
| Item | Guide price (inc VAT) |
|---|---|
| New black tarmac drive, full dig-out and new sub-base | £59–£93 per m² |
| Example: 30 m² drive | £1,950–£3,050 |
| Example: 50 m² drive | £2,950–£4,650 |
| Example: 80 m² drive | £4,700–£7,450 |
Towns we cover in Rutland
Postcode areas: LE.
What is included?
A new tarmac driveway is built from the ground up: the old surface and soil are dug out, a compacted stone sub-base is laid, then a hot binder course and a finer surface course are spread and rolled, and the edges are held by kerbs or blocks.
- Break out and remove the old surface and spoil
- Dig to formation level, usually around 230–250 mm below finished height
- Geotextile membrane where the ground is soft or clay
- Binder course (AC 20 dense), about 50–60 mm, laid hot and rolled
- Surface course (AC 6 dense), about 20–30 mm, laid hot and rolled
- Falls set so water runs to a channel, gully or soft landscaping
Rules in Rutland
In England, householder permitted development (Class F of the 2015 General Permitted Development Order) lets you lay a hard surface in front of a house without planning permission if it is porous, or if the rainwater is directed to a permeable area within the property. If the area is more than 5 m² and neither applies, you need permission. Standard dense tarmac is not porous, so a dense tarmac drive needs a lawn, border, channel to a soakaway or other permeable route for its water. Any new or widened crossing over the pavement needs approval from the highway authority (the county or unitary council).
How it is built
New tarmac driveways in Rutland: questions
How much does a new tarmac driveway cost in Rutland?
As a 2026 guide, about £59–£93 per m² inc VAT in Rutland. The survey confirms a fixed price.
Which towns in Rutland do you cover?
Oakham.
How long does a new tarmac driveway take?
Usually 2–4 working days for a typical drive, longer with drainage or a dropped kerb.
Does the price include taking away the old drive?
Yes. Our new-drive rates include breaking out, digging out and disposing of the old surface and spoil. Edging, drainage and dropped kerbs are listed separately on the quote.
Other services in Rutland
Get a written tarmac quote
Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.
- Surface courseDEPTH + MIX
- Binder courseDEPTH + MIX
- Sub-baseDEPTH + MATERIAL
- Edges, drainage, VATITEMISED