Line marking and speed humps in Rutland
Across in Rutland, we cover 1 towns for line marking jobs, including Oakham, Oakham and Oakham.

How much does car park line marking cost in Rutland?
Rates in Rutland follow the East Midlands, about 2% below our UK midpoint.
| Item | Guide price (ex VAT) |
|---|---|
| Bay marking on a new layout | £40–£120 per bay (£48–£140 inc VAT) |
| White lining, paint or thermoplastic | £2–£10 per metre (£2–£12 inc VAT) |
| Asphalt speed hump with markings | £780–£2,950 each (£940–£3,550 inc VAT) |
Towns we cover in Rutland
Postcode areas: LE.
What is included?
Car park line marking is the paint or thermoplastic lining that sets out bays, aisles, hatching, arrows and accessible spaces; speed humps are raised sections of asphalt that slow vehicles on car parks and private roads.
- Layout set out to your drawing or measured on site
- Standard and accessible bays with access zones
- Hatching, arrows, walkways and keep-clear areas
- Paint for short-term or low-traffic areas
- Hot thermoplastic for durability
- Asphalt speed humps with chevron markings
Rules in Rutland
Householder permitted development covers houses only. Car parks, yards, flats and business premises follow normal planning rules: resurfacing an existing area on the same footprint is generally fine, while a new car park, a change of use or new drainage may need permission. Check with the planning authority before any new hard area.
Line marking and speed humps in Rutland: questions
How much does car park line marking cost in Rutland?
As a 2026 guide, about £40–£120 per bay ex VAT in Rutland. The survey confirms a fixed price.
Which towns in Rutland do you cover?
Oakham.
How long does car park line marking take?
Often a day for a small car park.
How big is a standard car parking bay?
A common UK bay is 2.4 m by 4.8 m. Accessible bays add a hatched access zone, typically 1.2 m along the side and rear, following BS 8300-1 guidance.
Other services in Rutland
Get a written tarmac quote
Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.
- Surface courseDEPTH + MIX
- Binder courseDEPTH + MIX
- Sub-baseDEPTH + MATERIAL
- Edges, drainage, VATITEMISED