Permeable tarmac driveways in Rutland
Across in Rutland, we cover 1 towns for permeable tarmac driveways, including Oakham, Oakham and Oakham.

How much does a permeable tarmac driveway cost in Rutland?
Rates in Rutland follow the East Midlands, about 2% below our UK midpoint.
| Item | Guide price (inc VAT) |
|---|---|
| Porous asphalt drive on a permeable stone base | £78–£122 per m² |
| Example: 30 m² drive | £2,600–£4,050 |
| Example: 50 m² drive | £3,900–£6,100 |
| Example: 80 m² drive | £6,250–£9,800 |
Towns we cover in Rutland
Postcode areas: LE.
What is included?
A permeable tarmac drive uses porous asphalt, a mix with fewer fine particles so water passes through the gaps, laid on an open-graded stone base that stores the rain and lets it soak into the ground.
- Ground check: how fast does the soil drain?
- Dig out deeper than a standard drive to fit the storage layer
- Geotextile separating layer on the formation
- Open-graded permeable sub-base, often Type 3 or 4/20 stone
- Porous asphalt binder and surface courses
- Overflow to a soakaway or border on slow-draining ground
Rules in Rutland
In England, a new hard surface over 5 m² in front of a house needs planning permission unless it is porous or drains to a lawn, border or soakaway within the property. If the job needs a dropped kerb, the highway authority (the county or unitary council) approves it before any work on the footway.
Permeable tarmac driveways in Rutland: questions
How much does a permeable tarmac driveway cost in Rutland?
As a 2026 guide, about £78–£122 per m² inc VAT in Rutland. The survey confirms a fixed price.
Which towns in Rutland do you cover?
Oakham.
How long does a permeable tarmac driveway take?
Usually 3–5 working days.
Is porous tarmac weaker than normal tarmac?
For cars it performs well. It is not the right choice where heavy lorries turn tightly, which is why most commercial yards use dense asphalt with separate drainage.
Other services in Rutland
Get a written tarmac quote
Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.
- Surface courseDEPTH + MIX
- Binder courseDEPTH + MIX
- Sub-baseDEPTH + MATERIAL
- Edges, drainage, VATITEMISED