New tarmac driveways in Bristol
Looking for new tarmac driveways in Bristol? Start with a guide price, then a survey that turns it into a fixed, written specification.

How much does a new tarmac driveway cost in Bristol?
Rates in Bristol follow the South West, about 3% above our UK midpoint.
| Item | Guide price (inc VAT) |
|---|---|
| New black tarmac drive, full dig-out and new sub-base | £62–£98 per m² |
| Example: 30 m² drive | £2,050–£3,250 |
| Example: 50 m² drive | £3,100–£4,900 |
| Example: 80 m² drive | £4,950–£7,850 |
Towns we cover in Bristol
Postcode areas: BS.
What is included?
A new tarmac driveway is built from the ground up: the old surface and soil are dug out, a compacted stone sub-base is laid, then a hot binder course and a finer surface course are spread and rolled, and the edges are held by kerbs or blocks.
- Dig to formation level, usually around 230–250 mm below finished height
- Geotextile membrane where the ground is soft or clay
- MOT Type 1 sub-base laid and compacted in layers, about 150 mm
- Concrete-haunched kerbs or a block-paved border as edge restraint
- Surface course (AC 6 dense), about 20–30 mm, laid hot and rolled
- Falls set so water runs to a channel, gully or soft landscaping
Rules in Bristol
In England, householder permitted development (Class F of the 2015 General Permitted Development Order) lets you lay a hard surface in front of a house without planning permission if it is porous, or if the rainwater is directed to a permeable area within the property. If the area is more than 5 m² and neither applies, you need permission. Standard dense tarmac is not porous, so a dense tarmac drive needs a lawn, border, channel to a soakaway or other permeable route for its water. If the job needs a dropped kerb, the highway authority (the county or unitary council) approves it before any work on the footway.
How it is built
New tarmac driveways in Bristol: questions
How much does a new tarmac driveway cost in Bristol?
As a 2026 guide, about £62–£98 per m² inc VAT in Bristol. The survey confirms a fixed price.
Which towns in Bristol do you cover?
Bristol.
How long does a new tarmac driveway take?
Usually 2–4 working days for a typical drive, longer with drainage or a dropped kerb.
How deep should a tarmac driveway be?
For cars, a common build is about 150 mm of compacted MOT Type 1, a 50–60 mm binder course and a 20–30 mm surface course. Soft ground or heavier vehicles need more. Your quote should state each depth.
Other services in Bristol
Get a written tarmac quote
Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.
- Surface courseDEPTH + MIX
- Binder courseDEPTH + MIX
- Sub-baseDEPTH + MATERIAL
- Edges, drainage, VATITEMISED