Dropped kerbs and vehicle crossings in Bristol
Across in Bristol, we cover 1 towns for dropped kerbs, including Bristol, Bristol and Bristol.

How much does a dropped kerb cost in Bristol?
Rates in Bristol follow the South West, about 3% above our UK midpoint.
| Item | Guide price (inc VAT) |
|---|---|
| Dropped kerb construction where the council allows an approved contractor | £1,050–£3,100 per job |
Towns we cover in Bristol
Postcode areas: BS.
What is included?
A dropped kerb, or vehicle crossing, is a section of pavement and kerb lowered and strengthened so a vehicle can legally cross the footway to reach a driveway. It needs the highway authority's approval before any work starts.
- Check the frontage: trees, lamp posts, covers, junctions and sight lines
- Help preparing the application and site plan
- Planning permission check for classified roads
- Construction to the council's specification where approved contractors are allowed
- Footway reinstatement in tarmac or to match
- Coordinated with the new drive so both are finished together
Rules in Bristol
In England, a new hard surface over 5 m² in front of a house needs planning permission unless it is porous or drains to a lawn, border or soakaway within the property. Any new or widened crossing over the pavement needs approval from the highway authority (the county or unitary council).
Dropped kerbs and vehicle crossings in Bristol: questions
How much does a dropped kerb cost in Bristol?
As a 2026 guide, about £1,050–£3,100 per job inc VAT in Bristol. The survey confirms a fixed price.
Which towns in Bristol do you cover?
Bristol.
How long does a dropped kerb take?
Approval often takes weeks; building is usually 1–2 days.
Who approves a dropped kerb?
The highway authority: the county or unitary council in England, the council in Wales and Scotland, and DfI Roads in Northern Ireland.
Other services in Bristol
Get a written tarmac quote
Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.
- Surface courseDEPTH + MIX
- Binder courseDEPTH + MIX
- Sub-baseDEPTH + MATERIAL
- Edges, drainage, VATITEMISED