Edges, drainage and kerbs

Dropped kerbs and vehicle crossings in Surrey

Dropped kerbs and vehicle crossings in Surrey are priced from a site survey and an itemised specification, adjusted for the South East rates.

SURREY GUIDE£1,100–£3,300 per job inc VAT
Dropped kerb crossing with a new tarmac footway strip, typical of dropped kerb work

How much does a dropped kerb cost in Surrey?

Rates in Surrey follow the South East, about 10% above our UK midpoint.

ItemGuide price (inc VAT)
Dropped kerb construction where the council allows an approved contractor£1,100–£3,300 per job

Towns we cover in Surrey

Postcode areas: CR, GU, KT, RH, SM, TN, TW.

What is included?

A dropped kerb, or vehicle crossing, is a section of pavement and kerb lowered and strengthened so a vehicle can legally cross the footway to reach a driveway. It needs the highway authority's approval before any work starts.

  • Check the frontage: trees, lamp posts, covers, junctions and sight lines
  • Help preparing the application and site plan
  • Planning permission check for classified roads
  • Construction to the council's specification where approved contractors are allowed
  • Footway reinstatement in tarmac or to match
  • Coordinated with the new drive so both are finished together

Rules in Surrey

In England, householder permitted development (Class F of the 2015 General Permitted Development Order) lets you lay a hard surface in front of a house without planning permission if it is porous, or if the rainwater is directed to a permeable area within the property. If the area is more than 5 m² and neither applies, you need permission. Standard dense tarmac is not porous, so a dense tarmac drive needs a lawn, border, channel to a soakaway or other permeable route for its water. If the job needs a dropped kerb, the highway authority (the county or unitary council) approves it before any work on the footway.

How it is built

Footway surfacetarmac or to matchFootway baseto the council's specKerbsdropped units and transitionsApprovalhighway authority licenceINDICATIVE CROSS-SECTION · NOT TO SCALE

Dropped kerbs and vehicle crossings in Surrey: questions

How much does a dropped kerb cost in Surrey?

As a 2026 guide, about £1,100–£3,300 per job inc VAT in Surrey. The survey confirms a fixed price.

Which towns in Surrey do you cover?

Woking, Guildford, Esher, Redhill, Staines, Banstead, Leatherhead, Ewell and more.

How long does a dropped kerb take?

Approval often takes weeks; building is usually 1–2 days.

Who approves a dropped kerb?

The highway authority: the county or unitary council in England, the council in Wales and Scotland, and DfI Roads in Northern Ireland.

Other services in Surrey

Free survey for new surfacing

Get a written tarmac quote

Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.

  • Surface courseDEPTH + MIX
  • Binder courseDEPTH + MIX
  • Sub-baseDEPTH + MATERIAL
  • Edges, drainage, VATITEMISED
Call nowGet a price