Edges, drainage and kerbs

Dropped kerbs and vehicle crossings in Staffordshire

Across in Staffordshire, we cover 13 towns for dropped kerbs, including Stoke-on-Trent, Newcastle-under-Lyme and Burton upon Trent.

STAFFORDSHIRE GUIDE£1,000–£3,000 per job inc VAT
Dropped kerb crossing with a new tarmac footway strip, typical of dropped kerb work

How much does a dropped kerb cost in Staffordshire?

Rates in Staffordshire follow the West Midlands, in line with our UK midpoint.

ItemGuide price (inc VAT)
Dropped kerb construction where the council allows an approved contractor£1,000–£3,000 per job

Towns we cover in Staffordshire

Postcode areas: B, DE, ST, WS.

What is included?

A dropped kerb, or vehicle crossing, is a section of pavement and kerb lowered and strengthened so a vehicle can legally cross the footway to reach a driveway. It needs the highway authority's approval before any work starts.

  • Check the frontage: trees, lamp posts, covers, junctions and sight lines
  • Help preparing the application and site plan
  • Planning permission check for classified roads
  • Construction to the council's specification where approved contractors are allowed
  • Footway reinstatement in tarmac or to match
  • Coordinated with the new drive so both are finished together

Rules in Staffordshire

In England, a new hard surface over 5 m² in front of a house needs planning permission unless it is porous or drains to a lawn, border or soakaway within the property. A vehicle crossing over the footway is a separate approval, from the highway authority (the county or unitary council).

Dropped kerbs and vehicle crossings in Staffordshire: questions

How much does a dropped kerb cost in Staffordshire?

As a 2026 guide, about £1,000–£3,000 per job inc VAT in Staffordshire. The survey confirms a fixed price.

Which towns in Staffordshire do you cover?

Stoke-on-Trent, Newcastle-under-Lyme, Burton upon Trent, Cannock, Tamworth, Stafford, Lichfield, Kidsgrove and more.

How long does a dropped kerb take?

Approval often takes weeks; building is usually 1–2 days.

Who approves a dropped kerb?

The highway authority: the county or unitary council in England, the council in Wales and Scotland, and DfI Roads in Northern Ireland.

Other services in Staffordshire

Free survey for new surfacing

Get a written tarmac quote

Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.

  • Surface courseDEPTH + MIX
  • Binder courseDEPTH + MIX
  • Sub-baseDEPTH + MATERIAL
  • Edges, drainage, VATITEMISED
Call nowGet a price