Edges, drainage and kerbs

Drainage for tarmac drives in Staffordshire

Drainage for tarmac drives in Staffordshire are priced from a site survey and an itemised specification, adjusted for the West Midlands rates.

STAFFORDSHIRE GUIDE£60–£120 per metre inc VAT
Steel slot drainage channel across a tarmac drive at a garage door, typical of tarmac driveway drainage work

How much does tarmac driveway drainage cost in Staffordshire?

Rates in Staffordshire follow the West Midlands, in line with our UK midpoint.

ItemGuide price (inc VAT)
Linear drainage channel£60–£120 per metre
Soakaway or crate unit£650–£2,000 each

Towns we cover in Staffordshire

Postcode areas: B, DE, ST, WS.

What is included?

Driveway drainage is the plan for where rainwater goes once it hits a sealed tarmac surface: the falls that move it, the channels or gullies that catch it, and the soakaway, border or approved drain that takes it away.

  • Falls set across the drive, typically 1 in 60 to 1 in 80
  • Linear channel at garages, doors or the bottom of a slope
  • Soakaway or crate unit sized to the area and ground
  • Runoff directed to borders or a permeable strip
  • Connection to an existing surface-water drain where allowed
  • No connection to the foul sewer

Rules in Staffordshire

In England, a new hard surface over 5 m² in front of a house needs planning permission unless it is porous or drains to a lawn, border or soakaway within the property. Any new or widened crossing over the pavement needs approval from the highway authority (the county or unitary council).

Drainage for tarmac drives in Staffordshire: questions

How much does tarmac driveway drainage cost in Staffordshire?

As a 2026 guide, about £60–£120 per metre inc VAT in Staffordshire. The survey confirms a fixed price.

Which towns in Staffordshire do you cover?

Stoke-on-Trent, Newcastle-under-Lyme, Burton upon Trent, Cannock, Tamworth, Stafford, Lichfield, Kidsgrove and more.

How long does tarmac driveway drainage take?

Usually part of the main build; a soakaway adds about a day.

Why does water pool on my tarmac drive?

Usually the falls are too flat or the base has sunk in places. A channel can help, but a dip in the surface needs a repair or overlay to remove it.

Other services in Staffordshire

Free survey for new surfacing

Get a written tarmac quote

Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.

  • Surface courseDEPTH + MIX
  • Binder courseDEPTH + MIX
  • Sub-baseDEPTH + MATERIAL
  • Edges, drainage, VATITEMISED
Call nowGet a price