Driveways and paths · Ayrshire

Tarmac paths and footpaths in Irvine

Tarmac paths and footpaths in Irvine start with the parts you won't see: how deep the ground is dug, how much stone goes back in, and where the rain will run once the drive is sealed.

IRVINE GUIDE£54–£88 per m² inc VAT
Tarmac garden path with timber edging curving to a shed, typical of tarmac path work

How much should I budget in Irvine?

These Irvine guide prices reflect rates in Scotland, about 2% below our UK midpoint.

ItemGuide price (inc VAT)
Tarmac garden path or footpath, hand-laid£54–£88 per m²
Example: 10 m² path£650–£1,050
Example: 20 m² path£1,200–£1,950
Example: 40 m² path£2,150–£3,550

As a 2026 guide in Irvine, tarmac path work runs at about £54–£88 per m² including VAT, so a 10 m² path is roughly £650–£1,050. Guide only; the survey confirms a fixed price.

Covering Irvine

Survey cover and pricing for Irvine. We reach Irvine on our Ayrshire survey days; Kilmarnock is 6 miles away.

Postcodes
KA12, KA11
Area
Ayrshire
Nearest towns
Kilwinning (3 miles), Stevenston (4 miles), Saltcoats (5 miles), Troon (5 miles)
Pricing
Scotland, about 2% below our UK midpoint
Kerb approvals
The council

Nearby, we work in Kilwinning, Stevenston, Saltcoats, Troon, Kilmarnock.

Do I need permission in Irvine?

Repairs, paths and edging work rarely need planning permission. In Scotland, permitted development allows a hard surface between a house and a road only if it is porous or the water drains to a porous area within the property. Unlike England there is no 5 m² allowance, so it applies to any size. Conservation areas and the grounds of listed buildings have extra restrictions. The council, as roads authority, controls any new or widened access across a footway.

What is included in a tarmac path?

Garden paths, side passages and footpaths in hot-laid tarmac, edged with timber, kerbs or blocks.

  • Path set out to the line and width you want
  • Excavation to about 150–180 mm with spoil removed
  • MOT Type 1 base, about 100 mm, compacted
  • Binder and surface course laid hot by hand and rolled
  • Gentle cross-fall so water runs off to the border

The build-up we price

Surface courseabout 20 mm AC 6Binder courseabout 40–50 mm AC 20Baseabout 100 mm MOT Type 1Edgestimber, kerbs or blocksINDICATIVE CROSS-SECTION · NOT TO SCALE

Your questions answered

Which Irvine postcodes do you cover?

We cover Irvine including KA12, KA11, and nearby Kilwinning, Stevenston, Saltcoats.

How long will the work take at my Irvine property?

Often 1–2 days. We book Irvine surveys alongside other jobs in Ayrshire, and give you dates once the specification is agreed.

What is the price of a tarmac path in Irvine?

As a 2026 guide in Irvine, tarmac path work runs at about £54–£88 per m² including VAT, so a 10 m² path is roughly £650–£1,050. Edging, drainage and a dropped kerb are priced separately where needed.

Do I need permission for a tarmac path in Irvine?

In Scotland, a hard surface between the house and a road is permitted development only if it is porous or drains to a porous area within the property, whatever its size. Dropped kerbs are approved by the council as roads authority.

Also in Irvine

Send us a postcode, a rough size and a photo or two, and we'll come back with survey dates for Irvine.

Free survey for new surfacing

Tarmac paths and footpaths in Irvine: get a written quote

Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.

  • Surface courseDEPTH + MIX
  • Binder courseDEPTH + MIX
  • Sub-baseDEPTH + MATERIAL
  • Edges, drainage, VATITEMISED
Call nowGet a price