New tarmac driveways in the Scottish Borders
Looking for new tarmac driveways in the Scottish Borders? Start with a guide price, then a survey that turns it into a fixed, written specification.

How much does a new tarmac driveway cost in the Scottish Borders?
Rates in the Scottish Borders follow Scotland, about 2% below our UK midpoint.
| Item | Guide price (inc VAT) |
|---|---|
| New black tarmac drive, full dig-out and new sub-base | £59–£93 per m² |
| Example: 30 m² drive | £1,950–£3,050 |
| Example: 50 m² drive | £2,950–£4,650 |
| Example: 80 m² drive | £4,700–£7,450 |
Towns we cover in the Scottish Borders
Postcode areas: EH, TD.
What is included?
A new tarmac driveway is built from the ground up: the old surface and soil are dug out, a compacted stone sub-base is laid, then a hot binder course and a finer surface course are spread and rolled, and the edges are held by kerbs or blocks.
- Break out and remove the old surface and spoil
- Dig to formation level, usually around 230–250 mm below finished height
- MOT Type 1 sub-base laid and compacted in layers, about 150 mm
- Concrete-haunched kerbs or a block-paved border as edge restraint
- Binder course (AC 20 dense), about 50–60 mm, laid hot and rolled
- Surface course (AC 6 dense), about 20–30 mm, laid hot and rolled
Rules in the Scottish Borders
In Scotland, a hard surface between the house and a road is permitted development only if it is porous or drains to a porous area within the property, whatever its size. A vehicle crossing over the footway is a separate approval, from the council as roads authority.
How it is built
New tarmac driveways in the Scottish Borders: questions
How much does a new tarmac driveway cost in the Scottish Borders?
As a 2026 guide, about £59–£93 per m² inc VAT in the Scottish Borders. The survey confirms a fixed price.
Which towns in the Scottish Borders do you cover?
Hawick, Galashiels, Peebles, Kelso, Selkirk.
How long does a new tarmac driveway take?
Usually 2–4 working days for a typical drive, longer with drainage or a dropped kerb.
Does the price include taking away the old drive?
Yes. Our new-drive rates include breaking out, digging out and disposing of the old surface and spoil. Edging, drainage and dropped kerbs are listed separately on the quote.
Other services in the Scottish Borders
Get a written tarmac quote
Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.
- Surface courseDEPTH + MIX
- Binder courseDEPTH + MIX
- Sub-baseDEPTH + MATERIAL
- Edges, drainage, VATITEMISED