Driveways and paths

New tarmac driveways in Angus and Dundee

Across in Angus and Dundee, we cover 6 towns for new tarmac driveways, including Dundee, Arbroath and Forfar.

ANGUS AND DUNDEE GUIDE£59–£93 per m² inc VAT
Wide new tarmac driveway with granite sett border leading to a garage, typical of new tarmac driveway work

How much does a new tarmac driveway cost in Angus and Dundee?

Rates in Angus and Dundee follow Scotland, about 2% below our UK midpoint.

ItemGuide price (inc VAT)
New black tarmac drive, full dig-out and new sub-base£59–£93 per m²
Example: 30 m² drive£1,950–£3,050
Example: 50 m² drive£2,950–£4,650
Example: 80 m² drive£4,700–£7,450

Towns we cover in Angus and Dundee

Postcode areas: DD.

What is included?

A new tarmac driveway is built from the ground up: the old surface and soil are dug out, a compacted stone sub-base is laid, then a hot binder course and a finer surface course are spread and rolled, and the edges are held by kerbs or blocks.

  • Break out and remove the old surface and spoil
  • Geotextile membrane where the ground is soft or clay
  • MOT Type 1 sub-base laid and compacted in layers, about 150 mm
  • Binder course (AC 20 dense), about 50–60 mm, laid hot and rolled
  • Surface course (AC 6 dense), about 20–30 mm, laid hot and rolled
  • Falls set so water runs to a channel, gully or soft landscaping

Rules in Angus and Dundee

In Scotland, a hard surface between the house and a road is permitted development only if it is porous or drains to a porous area within the property, whatever its size. If the job needs a dropped kerb, the council as roads authority approves it before any work on the footway.

New tarmac driveways in Angus and Dundee: questions

How much does a new tarmac driveway cost in Angus and Dundee?

As a 2026 guide, about £59–£93 per m² inc VAT in Angus and Dundee. The survey confirms a fixed price.

Which towns in Angus and Dundee do you cover?

Dundee, Arbroath, Forfar, Montrose, Carnoustie, Brechin.

How long does a new tarmac driveway take?

Usually 2–4 working days for a typical drive, longer with drainage or a dropped kerb.

When can I drive on new tarmac?

Usually you can walk on it the same day once it has cooled. Allow at least 48 hours before parking, and preferably 3–5 days, longer in hot weather, and avoid turning the steering wheel while stationary for the first few weeks.

Other services in Angus and Dundee

Free survey for new surfacing

Get a written tarmac quote

Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.

  • Surface courseDEPTH + MIX
  • Binder courseDEPTH + MIX
  • Sub-baseDEPTH + MATERIAL
  • Edges, drainage, VATITEMISED
Call nowGet a price