Dropped kerbs and vehicle crossings in Wiltshire
Looking for dropped kerbs in Wiltshire? Start with a guide price, then a survey that turns it into a fixed, written specification.

How much does a dropped kerb cost in Wiltshire?
Rates in Wiltshire follow the South West, about 3% above our UK midpoint.
| Item | Guide price (inc VAT) |
|---|---|
| Dropped kerb construction where the council allows an approved contractor | £1,050–£3,100 per job |
Towns we cover in Wiltshire
Postcode areas: BA, SN, SP.
What is included?
A dropped kerb, or vehicle crossing, is a section of pavement and kerb lowered and strengthened so a vehicle can legally cross the footway to reach a driveway. It needs the highway authority's approval before any work starts.
- Check the frontage: trees, lamp posts, covers, junctions and sight lines
- Help preparing the application and site plan
- Planning permission check for classified roads
- Construction to the council's specification where approved contractors are allowed
- Footway reinstatement in tarmac or to match
- Coordinated with the new drive so both are finished together
Rules in Wiltshire
In England, householder permitted development (Class F of the 2015 General Permitted Development Order) lets you lay a hard surface in front of a house without planning permission if it is porous, or if the rainwater is directed to a permeable area within the property. If the area is more than 5 m² and neither applies, you need permission. Standard dense tarmac is not porous, so a dense tarmac drive needs a lawn, border, channel to a soakaway or other permeable route for its water. A vehicle crossing over the footway is a separate approval, from the highway authority (the county or unitary council).
Dropped kerbs and vehicle crossings in Wiltshire: questions
How much does a dropped kerb cost in Wiltshire?
As a 2026 guide, about £1,050–£3,100 per job inc VAT in Wiltshire. The survey confirms a fixed price.
Which towns in Wiltshire do you cover?
Swindon, Salisbury, Trowbridge, Chippenham, Melksham, Warminster, Calne, Westbury and more.
How long does a dropped kerb take?
Approval often takes weeks; building is usually 1–2 days.
Who approves a dropped kerb?
The highway authority: the county or unitary council in England, the council in Wales and Scotland, and DfI Roads in Northern Ireland.
Other services in Wiltshire
Get a written tarmac quote
Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.
- Surface courseDEPTH + MIX
- Binder courseDEPTH + MIX
- Sub-baseDEPTH + MATERIAL
- Edges, drainage, VATITEMISED