Edges, drainage and kerbs

Dropped kerbs and vehicle crossings in Herefordshire

Across in Herefordshire, we cover 4 towns for dropped kerbs, including Hereford, Leominster and Ross-on-Wye.

HEREFORDSHIRE GUIDE£1,000–£3,000 per job inc VAT
Dropped kerb crossing with a new tarmac footway strip, typical of dropped kerb work

How much does a dropped kerb cost in Herefordshire?

Rates in Herefordshire follow the West Midlands, in line with our UK midpoint.

ItemGuide price (inc VAT)
Dropped kerb construction where the council allows an approved contractor£1,000–£3,000 per job

Towns we cover in Herefordshire

Postcode areas: GL, HR.

What is included?

A dropped kerb, or vehicle crossing, is a section of pavement and kerb lowered and strengthened so a vehicle can legally cross the footway to reach a driveway. It needs the highway authority's approval before any work starts.

  • Check the frontage: trees, lamp posts, covers, junctions and sight lines
  • Help preparing the application and site plan
  • Planning permission check for classified roads
  • Construction to the council's specification where approved contractors are allowed
  • Footway reinstatement in tarmac or to match
  • Coordinated with the new drive so both are finished together

Rules in Herefordshire

In England, a new hard surface over 5 m² in front of a house needs planning permission unless it is porous or drains to a lawn, border or soakaway within the property. Any new or widened crossing over the pavement needs approval from the highway authority (the county or unitary council).

How it is built

Footway surfacetarmac or to matchFootway baseto the council's specKerbsdropped units and transitionsApprovalhighway authority licenceINDICATIVE CROSS-SECTION · NOT TO SCALE

Dropped kerbs and vehicle crossings in Herefordshire: questions

How much does a dropped kerb cost in Herefordshire?

As a 2026 guide, about £1,000–£3,000 per job inc VAT in Herefordshire. The survey confirms a fixed price.

Which towns in Herefordshire do you cover?

Hereford, Leominster, Ross-on-Wye, Ledbury.

How long does a dropped kerb take?

Approval often takes weeks; building is usually 1–2 days.

Can you build my dropped kerb?

Where your council allows approved or accredited contractors to build crossings, yes, to their specification. Where the council builds them itself, we coordinate the drive around its dates.

Other services in Herefordshire

Free survey for new surfacing

Get a written tarmac quote

Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.

  • Surface courseDEPTH + MIX
  • Binder courseDEPTH + MIX
  • Sub-baseDEPTH + MATERIAL
  • Edges, drainage, VATITEMISED
Call nowGet a price