Edges, drainage and kerbs

Dropped kerbs and vehicle crossings in Greater London

Across in Greater London, we cover 66 towns for dropped kerbs, including Brent, Islington and Westminster.

GREATER LONDON GUIDE£1,200–£3,600 per job inc VAT
Dropped kerb crossing with a new tarmac footway strip, typical of dropped kerb work

How much does a dropped kerb cost in Greater London?

Rates in Greater London follow London, about 20% above our UK midpoint.

ItemGuide price (inc VAT)
Dropped kerb construction where the council allows an approved contractor£1,200–£3,600 per job

Towns we cover in Greater London

Postcode areas: BR, CR, DA, E, EC, EN, HA, IG, KT, N, NW, RM, SE, SL, SM, SW, TW, UB, W, WC.

What is included?

A dropped kerb, or vehicle crossing, is a section of pavement and kerb lowered and strengthened so a vehicle can legally cross the footway to reach a driveway. It needs the highway authority's approval before any work starts.

  • Check the frontage: trees, lamp posts, covers, junctions and sight lines
  • Help preparing the application and site plan
  • Planning permission check for classified roads
  • Construction to the council's specification where approved contractors are allowed
  • Footway reinstatement in tarmac or to match
  • Coordinated with the new drive so both are finished together

Rules in Greater London

In England, a new hard surface over 5 m² in front of a house needs planning permission unless it is porous or drains to a lawn, border or soakaway within the property. If the job needs a dropped kerb, the highway authority (the county or unitary council) approves it before any work on the footway.

Dropped kerbs and vehicle crossings in Greater London: questions

How much does a dropped kerb cost in Greater London?

As a 2026 guide, about £1,200–£3,600 per job inc VAT in Greater London. The survey confirms a fixed price.

Which towns in Greater London do you cover?

Brent, Islington, Westminster, Bexley, Barking, Sutton, Croydon, Ilford and more.

How long does a dropped kerb take?

Approval often takes weeks; building is usually 1–2 days.

Do I need planning permission for a dropped kerb?

You do if the road is classified (an A, B or C road) and in some other cases. Unclassified residential roads usually need only the highway licence, but check your council's guidance.

Other services in Greater London

Free survey for new surfacing

Get a written tarmac quote

Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.

  • Surface courseDEPTH + MIX
  • Binder courseDEPTH + MIX
  • Sub-baseDEPTH + MATERIAL
  • Edges, drainage, VATITEMISED
Call nowGet a price