Edges, drainage and kerbs

Dropped kerbs and vehicle crossings in the Forth Valley

Dropped kerbs and vehicle crossings in the Forth Valley are priced from a site survey and an itemised specification, adjusted for Scotland rates.

FORTH VALLEY GUIDE£980–£2,950 per job inc VAT
Dropped kerb crossing with a new tarmac footway strip, typical of dropped kerb work

How much does a dropped kerb cost in the Forth Valley?

Rates in the Forth Valley follow Scotland, about 2% below our UK midpoint.

ItemGuide price (inc VAT)
Dropped kerb construction where the council allows an approved contractor£980–£2,950 per job

Towns we cover in the Forth Valley

Postcode areas: EH, FK.

What is included?

A dropped kerb, or vehicle crossing, is a section of pavement and kerb lowered and strengthened so a vehicle can legally cross the footway to reach a driveway. It needs the highway authority's approval before any work starts.

  • Check the frontage: trees, lamp posts, covers, junctions and sight lines
  • Help preparing the application and site plan
  • Planning permission check for classified roads
  • Construction to the council's specification where approved contractors are allowed
  • Footway reinstatement in tarmac or to match
  • Coordinated with the new drive so both are finished together

Rules in the Forth Valley

In Scotland, permitted development allows a hard surface between a house and a road only if it is porous or the water drains to a porous area within the property. Unlike England there is no 5 m² allowance, so it applies to any size. Conservation areas and the grounds of listed buildings have extra restrictions. The council, as roads authority, controls any new or widened access across a footway.

How it is built

Footway surfacetarmac or to matchFootway baseto the council's specKerbsdropped units and transitionsApprovalhighway authority licenceINDICATIVE CROSS-SECTION · NOT TO SCALE

Dropped kerbs and vehicle crossings in the Forth Valley: questions

How much does a dropped kerb cost in the Forth Valley?

As a 2026 guide, about £980–£2,950 per job inc VAT in the Forth Valley. The survey confirms a fixed price.

Which towns in the Forth Valley do you cover?

Stirling, Falkirk, Alloa, Grangemouth, Bo'ness, Stenhousemuir, Larbert, Dunblane.

How long does a dropped kerb take?

Approval often takes weeks; building is usually 1–2 days.

Can you build my dropped kerb?

Where your council allows approved or accredited contractors to build crossings, yes, to their specification. Where the council builds them itself, we coordinate the drive around its dates.

Other services in the Forth Valley

Free survey for new surfacing

Get a written tarmac quote

Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.

  • Surface courseDEPTH + MIX
  • Binder courseDEPTH + MIX
  • Sub-baseDEPTH + MATERIAL
  • Edges, drainage, VATITEMISED
Call nowGet a price