Dropped kerbs and vehicle crossings in Cambridgeshire
Across in Cambridgeshire, we cover 8 towns for dropped kerbs, including Peterborough, Cambridge and Wisbech.

How much does a dropped kerb cost in Cambridgeshire?
Rates in Cambridgeshire follow the East of England, about 5% above our UK midpoint.
| Item | Guide price (inc VAT) |
|---|---|
| Dropped kerb construction where the council allows an approved contractor | £1,050–£3,150 per job |
Towns we cover in Cambridgeshire
Postcode areas: CB, PE.
What is included?
A dropped kerb, or vehicle crossing, is a section of pavement and kerb lowered and strengthened so a vehicle can legally cross the footway to reach a driveway. It needs the highway authority's approval before any work starts.
- Check the frontage: trees, lamp posts, covers, junctions and sight lines
- Help preparing the application and site plan
- Planning permission check for classified roads
- Construction to the council's specification where approved contractors are allowed
- Footway reinstatement in tarmac or to match
- Coordinated with the new drive so both are finished together
Rules in Cambridgeshire
In England, householder permitted development (Class F of the 2015 General Permitted Development Order) lets you lay a hard surface in front of a house without planning permission if it is porous, or if the rainwater is directed to a permeable area within the property. If the area is more than 5 m² and neither applies, you need permission. Standard dense tarmac is not porous, so a dense tarmac drive needs a lawn, border, channel to a soakaway or other permeable route for its water. Any new or widened crossing over the pavement needs approval from the highway authority (the county or unitary council).
Dropped kerbs and vehicle crossings in Cambridgeshire: questions
How much does a dropped kerb cost in Cambridgeshire?
As a 2026 guide, about £1,050–£3,150 per job inc VAT in Cambridgeshire. The survey confirms a fixed price.
Which towns in Cambridgeshire do you cover?
Peterborough, Cambridge, Wisbech, St Neots, Huntingdon, March, Ely, St Ives.
How long does a dropped kerb take?
Approval often takes weeks; building is usually 1–2 days.
Do I need planning permission for a dropped kerb?
You do if the road is classified (an A, B or C road) and in some other cases. Unclassified residential roads usually need only the highway licence, but check your council's guidance.
Other services in Cambridgeshire
Get a written tarmac quote
Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.
- Surface courseDEPTH + MIX
- Binder courseDEPTH + MIX
- Sub-baseDEPTH + MATERIAL
- Edges, drainage, VATITEMISED