Edges, drainage and kerbs

Dropped kerbs and vehicle crossings in Bedfordshire

From Luton to the smaller towns in Bedfordshire, our dropped kerbs quotes list the depths, edging, drainage and VAT so you can compare like with like.

BEDFORDSHIRE GUIDE£1,050–£3,150 per job inc VAT
Dropped kerb crossing with a new tarmac footway strip, typical of dropped kerb work

How much does a dropped kerb cost in Bedfordshire?

Rates in Bedfordshire follow the East of England, about 5% above our UK midpoint.

ItemGuide price (inc VAT)
Dropped kerb construction where the council allows an approved contractor£1,050–£3,150 per job

Towns we cover in Bedfordshire

Postcode areas: LU, MK, SG.

What is included?

A dropped kerb, or vehicle crossing, is a section of pavement and kerb lowered and strengthened so a vehicle can legally cross the footway to reach a driveway. It needs the highway authority's approval before any work starts.

  • Check the frontage: trees, lamp posts, covers, junctions and sight lines
  • Help preparing the application and site plan
  • Planning permission check for classified roads
  • Construction to the council's specification where approved contractors are allowed
  • Footway reinstatement in tarmac or to match
  • Coordinated with the new drive so both are finished together

Rules in Bedfordshire

In England, a new hard surface over 5 m² in front of a house needs planning permission unless it is porous or drains to a lawn, border or soakaway within the property. A vehicle crossing over the footway is a separate approval, from the highway authority (the county or unitary council).

How it is built

Footway surfacetarmac or to matchFootway baseto the council's specKerbsdropped units and transitionsApprovalhighway authority licenceINDICATIVE CROSS-SECTION · NOT TO SCALE

Dropped kerbs and vehicle crossings in Bedfordshire: questions

How much does a dropped kerb cost in Bedfordshire?

As a 2026 guide, about £1,050–£3,150 per job inc VAT in Bedfordshire. The survey confirms a fixed price.

Which towns in Bedfordshire do you cover?

Luton, Bedford, Dunstable, Leighton Buzzard, Ampthill, Kempston, Biggleswade.

How long does a dropped kerb take?

Approval often takes weeks; building is usually 1–2 days.

Do I need planning permission for a dropped kerb?

You do if the road is classified (an A, B or C road) and in some other cases. Unclassified residential roads usually need only the highway licence, but check your council's guidance.

Other services in Bedfordshire

Free survey for new surfacing

Get a written tarmac quote

Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.

  • Surface courseDEPTH + MIX
  • Binder courseDEPTH + MIX
  • Sub-baseDEPTH + MATERIAL
  • Edges, drainage, VATITEMISED
Call nowGet a price