Car park and yard repairs in Argyll and Bute
Car park and yard repairs in Argyll and Bute are priced from a site survey and an itemised specification, adjusted for Scotland rates.

How much does a car park pothole repair cost in Argyll and Bute?
Rates in Argyll and Bute follow Scotland, about 8% above our UK midpoint. Work here is by arrangement because of travel and haulage.
| Item | Guide price (ex VAT) |
|---|---|
| Car park or yard pothole repair | £160–£430 each (£190–£520 inc VAT) |
Towns we cover in Argyll and Bute
Postcode areas: G, PA.
What is included?
Commercial tarmac repair means cutting out potholes, trips and failed areas in a car park or yard, rebuilding the base where needed, and re-laying hot asphalt flush with sealed joints so the repair outlasts a cold patch.
- Areas saw-cut square back to sound material
- Failed base dug out and rebuilt
- Bond coat to cut faces
- Hot asphalt laid flush and rolled
- Joints sealed
- Lines reinstated over repairs
Rules in Argyll and Bute
Householder permitted development covers houses only. Car parks, yards, flats and business premises follow normal planning rules: resurfacing an existing area on the same footprint is generally fine, while a new car park, a change of use or new drainage may need permission. Check with the planning authority before any new hard area.
How it is built
Car park and yard repairs in Argyll and Bute: questions
How much does a car park pothole repair cost in Argyll and Bute?
As a 2026 guide, about £160–£430 each ex VAT in Argyll and Bute. The survey confirms a fixed price.
Which towns in Argyll and Bute do you cover?
Helensburgh, Dunoon, Oban, by arrangement.
How long does a car park pothole repair take?
Often a day for a planned batch of repairs.
Do you offer planned maintenance visits?
Yes. A yearly walk-round before winter catches small failures before they become potholes, and we price them as one batch.
Other services in Argyll and Bute
Get a written tarmac quote
Send a postcode and a rough size and we'll arrange a survey. Every quote lists the layers, edging, drainage and VAT.
- Surface courseDEPTH + MIX
- Binder courseDEPTH + MIX
- Sub-baseDEPTH + MATERIAL
- Edges, drainage, VATITEMISED